urbanglasgow.co.uk
For information past, present & future on the city of Glasgow, Scotland, UK
 
  FAQFAQ    SearchSearch    MemberlistMemberlist    UsergroupsUsergroups    Join! (free) Join! (free)
  ProfileProfile    Log in to check your private messagesLog in to check your private messages    Log inLog in 

Generic Glasgow Railways Thread
Page Previous  1, 2, 3 ... 79, 80, 81
 
Post new topic   Reply to topic    urbanglasgow.co.uk Forum Index -> Glasgow Development & Demolition
View previous topic :: View next topic  
Author Message
James
Moderator
Moderator


Joined: 30 Jul 2007
Posts: 6659


Location: Utopia Planitia

PostPosted: Sat Apr 01, 2017 8:32 am    Post subject: Reply with quote Report this post to Mods

Glasgow station's £100m upgrade gets green light (© BBC)



A major redevelopment of Glasgow's Queen Street Station has been given formal approval.


The work will include provision for longer trains and capacity for the station to handle increased passenger
numbers. Scottish ministers have signed a Transport and Works Scotland (Taws) order to allow the "major
facelift" to go ahead. Work at the station will cost more than £100m and should be completed by 2019.

Transport Minister Humza Yousaf said: "The Scottish government is delivering the most ambitious programme
of rail investment ever seen in Scotland, committing over £5bn across the current funding period. Approval
of this Taws Order allows Network Rail to undertake significant enhancements to Glasgow Queen Street Station.

"This continued investment in our key rail hubs will not only accommodate longer trains and the future growth
in passenger numbers, it will also improve the overall service experience." He added: "Coupled with new longer,
faster, greener Class 385 trains coming later this year and a full fleet refurbishment, we are doing what we
can now to deliver a Scottish rail industry for the future, one which encourages even more people opt to get
out their cars and onto trains."

Queen Street handles 20 million passengers a year. Network Rail said the revamp was needed to meet predicted
growth to 28 million passengers by 2030. There will be a number of major new developments at the station and
surrounding areas, including an extension of the east side of the building into the Buchanan Galleries shopping
centre.

The current entrance will also be replaced with a 500 sq m glass facade. The project is part of the Scottish
government's £650m Edinburgh Glasgow Improvement Programme (EGIP), which aims to reduce journey times
and increase capacity on Scotland's main rail routes.



James H
_________________
The blinding obvious is what you showed to me.....
Back to top
View user's profile Send private message Visit poster's website
James
Moderator
Moderator


Joined: 30 Jul 2007
Posts: 6659


Location: Utopia Planitia

PostPosted: Mon Apr 03, 2017 3:38 pm    Post subject: Reply with quote Report this post to Mods

ScotRail's 'new' HSTs (© Railengineer)



In 2012, Transport Scotland published the results of its rail passenger service consultation. This considered how the
railway should develop and the types of passenger services required. Its results were incorporated into the specification
for the ScotRail franchise which was renewed in 2014.


One conclusion from this consultation exercise was that passengers traveling from central Scotland to Aberdeen and
Inverness much preferred to travel in Virgin Trains East Coast High Speed Trains (HSTs) from London than ScotRailís
Class 170 diesel multiple units (DMUs).

For this reason, the invitation to tender (ITT) document for the ScotRail franchise included a specification for improved
rolling stock for Scotlandís internal inter-city services that could have been based on the HSTís mark 3 coach. In its
franchise bid, Abellioís response to this requirement was that it would provide refurbished HSTs on the routes that
serve Scotlandís seven cities (Glasgow, Edinburgh, Stirling, Perth, Dundee, Aberdeen and Inverness).

ScotRailís 26 HSTs

The HSTs will be phased into service from summer 2018, with the full fleet operational for the May 2019 timetable
change. This aligns with the completion of Network Railís Highland main line journey time improvements project. 54
power cars and 121 coaches will be leased from Angel Trains. These will make up 17 five-coach trains and 9 four-
coach trains with two power cars spare. The 2019 timetable will require 23 trains in service each day with five coach
sets operating Central Belt to Aberdeen services and the four coach trains generally running to Inverness. The
number of through services from Inverness to the Central Belt via Aberdeen will also be increased.

ScotRailís HST project manager Chris Tait commented: ďWeíre looking to do something special!Ē Ė these trains will be
transformed after they are released from Great Western Railway (GWR) later this year as the new Hitachi IEP trains
are introduced. Brush Traction in Loughborough will work on the power cars whilst the coaches will be transformed by
Wabtec in Doncaster, which will review options to undertake a C4 or C6 overhaul whilst they are being refurbished.

To ensure structural integrity of the vehicles up to 2030, a large part of the power car work is the rectification of any
corrosion or degradation of glass reinforced plastic cab exterior. Cabs are to be improved with better seats and fitted
with forward facing CCTV. The GWR automatic train protection equipment will be left in place, but isolated as it is a
part of the speedometer system. A new door interlock emergency override switch will be fitted to allow the driver to
stop the train away from any hazards.

Brush Traction will also apply a new livery to the power cars. Although branding of the HSTs is still at the concept
stage, it is likely that each power car and coach will feature iconic images of Scotlandís seven cities.

Power-operated doors

There will be four types of coaches. The business-class coach (TFC) will include the trainís catering area and have a
self-service bottled drinks and snacks facility for their passengers. Of the types of standard class coaches, one has no
special features (TSL), one has two wheelchair spaces and a toilet for persons with reduced mobility (TSD) and one
has a rack for two bicycles (TS). Each train can carry eight bicycles, three of which can be carried in a rack in each of
the power carís luggage compartments, although these will only be available for end-to-end journeys.

The new external power-operated sliding doors will be manufactured by Vapor Stone Rail Systems, part of the Wabtec
Group in Mexico and USA. Chris advises that the worldwide use of these doors with their simple electric worm drive
and over-centre lock has proved to be highly reliable and that their fitment is relatively straightforward. To give train
crews consistency of operation, the door controls will be similar to those on the class 170 DMUs.

Coach interiors will be completely revamped with ample luggage space provided. Business class will have leather
reclining seats and the new standard class seats will be provided by Grammer. In standard seating areas, the GWR
table seat pitch of 1680mm is to be extended to the 1800mm in ScotRailís class 170 DMUs. Seating will also be better
aligned with windows. However, this is not a straightforward requirement, as it became apparent that such alterations
would need to be validated by full-scale crash testing.

Further investigation revealed that such crash testing would not be necessary if seat alterations did not change the
table-to-seat distance. Hence the solution was 120mm wider tables, although this requires a destructive crush test to
confirm the tableís strength.

The coaches are to be fitted with the passenger systems that are currently being fitted to ScotRail DMUs as part of
their refurbishment programme. The existing Nomad Wi-Fi system will have new dual element 3G/4G antennas and
have a Wi-Fi to shore capability. Infodev is providing the infra-red passenger counting equipment that will download
information at key base stations, and R2p the hi-definition CCTV cameras, two of which will be in each coach. These
will have a remote download capability with the Wi-Fi system. The centre-saloon dot matrix passenger information
system will come from TrainFX.

Modern controlled emission toilets from Semvac will be fitted, providing a significant environmental improvement.

Depot alterations

ScotRailís HSTs will require significant alterations to depots and servicing points. Moreover, they are not the only new
trains coming to Scotland. IEPs will soon be running on the east coast to Aberdeen and Inverness, Caledonian Sleepers
are introducing new sleeper trains and new class 385 electric trains will soon be running between Edinburgh and Glasgow.

Chris advised that the respective project teams for these new trains are working well together to ensure that common
servicing facilities are compatible for all new rolling stock, for example, by extended hoses and cabling. The most
significant item of work is at Haymarket depot where the eastern end of the maintenance shed is to be extended by
39 metres to accommodate five-coach HSTs. The depot is also to get an improved external crane for power car
engine changes.

The maintenance of coaches at Haymarket is a first for the depot, which to date has serviced powered vehicles. Hence
it needs a shunting vehicle for which alternatives to the class 08 shunter, which was introduced in 1952, are being considered.

In conjunction with IEP works, Inverness depot is being modified to accommodate five-coach HSTs. This includes the
provision of extractor fans. The facility at Perth is being upgraded to accommodate four- coach units, as anything
longer is currently not possible. There are also, however, long term plans for a new maintenance facility at Perth.

New trains from old

The iconic HST is now over forty years old. It ensured the success of British Railís inter-city service and is still the
worldís fastest diesel train, although the ScotRail HSTs will have a maximum speed of 100 mph. With around ten
million miles on the clock these trains are approaching retirement for long-distance services as they are about to be
replaced by IEPs. However, as ScotRail is about to demonstrate with its reincarnation of these trains, there is still
much life left in them.

Some might think it odd that a train operator would wish to invest in such old, well-travelled trains. Yet, like the executioners
axe at the Tower of London with new handles and new blades, their key components have been changed many times
over and the work done by Wabtec and Brush will, no doubt, deliver a life-extended, reliable, refurbished train.

This new HST fleet will provide a 33 per cent increase in capacity on Scotlandís internal inter-city network. Their high
power-to-weight ratio will deliver the reduction in journey times required by the franchise specification and ensure the
severe gradients in the highlands are not a problem. They will be costlier to operate and maintain than current rolling
stock. However, their re-vamped mark 3 coaches will generate extra business by giving passengers what they want.
This must be good for business and for Scotlandís passenger railway.



James H
_________________
The blinding obvious is what you showed to me.....
Back to top
View user's profile Send private message Visit poster's website
joelang1699
Buttered roll
Buttered roll


Joined: 16 Sep 2008
Posts: 10



PostPosted: Wed Apr 19, 2017 7:47 pm    Post subject: Reply with quote Report this post to Mods

Shame we cant have HSTs for E&g operation!
Back to top
View user's profile Send private message MSN Messenger
Vinny the Mackem
Sausage supper
Sausage supper


Joined: 08 Dec 2009
Posts: 613


Location: Glasgow

PostPosted: Wed May 03, 2017 4:16 pm    Post subject: Reply with quote Report this post to Mods

On a train from Dumbarton to Glasgow this afternoon. It skipped the five scheduled stops between Dalmuir and Hyndland due to "staff being out of position."

Anyone got any idea what that actually means?
_________________
Nothing interesting in this bit!
Back to top
View user's profile Send private message
Charlie Endell
Chips & Curry sauce
Chips & Curry sauce


Joined: 22 Oct 2008
Posts: 243


Location: Cathcart

PostPosted: Mon May 08, 2017 1:13 pm    Post subject: Reply with quote Report this post to Mods

Vinny the Mackem wrote:
On a train from Dumbarton to Glasgow this afternoon. It skipped the five scheduled stops between Dalmuir and Hyndland due to "staff being out of position."

Anyone got any idea what that actually means?

I asked a driver - driver was not where he was supposed to be to take over the train and there can be a multitude of reasons for that.
Back to top
View user's profile Send private message
Vinny the Mackem
Sausage supper
Sausage supper


Joined: 08 Dec 2009
Posts: 613


Location: Glasgow

PostPosted: Mon May 08, 2017 6:20 pm    Post subject: Reply with quote Report this post to Mods

Charlie Endell wrote:
Vinny the Mackem wrote:
On a train from Dumbarton to Glasgow this afternoon. It skipped the five scheduled stops between Dalmuir and Hyndland due to "staff being out of position."

Anyone got any idea what that actually means?

I asked a driver - driver was not where he was supposed to be to take over the train and there can be a multitude of reasons for that.

Fairy nuff! Sounds logical, I suppose. It was just an announcement I'd never heard before.
_________________
Nothing interesting in this bit!
Back to top
View user's profile Send private message
BTJustice
Deep fried Mars bar
Deep fried Mars bar


Joined: 29 Mar 2010
Posts: 1017


Location: Cathcart

PostPosted: Sun Jun 18, 2017 6:46 pm    Post subject: Reply with quote Report this post to Mods

Here is a short video on Blue Peter's visit to Scotland a few years ago.

Not quite Glasgow but it would have been in Central before heading to Ayr.


Link


Dave
_________________
Check out my flickr;
http://www.flickr.com/photos/route9autos/
Back to top
View user's profile Send private message Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic    urbanglasgow.co.uk Forum Index -> Glasgow Development & Demolition All times are GMT + 1 Hour
Page Previous  1, 2, 3 ... 79, 80, 81
Page 81 of 81

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group and a bunch of camp hockey players...
Copyright © 2017 urbanglasgow.co.uk
Create your own free forum | Buy a domain to use with your forum
The early bird catches the worm (proverb) | The second mouse gets the cheese (fact)